Skip to main content

Scrapyard Wars 2: $500 Water-Cooled PC Build With Junk Parts

Linus Tech TipsMarch 31, 20251h 21min780,662 views
33 connections·40 entities in this video→

Scrapyard Wars 2 Challenge

  • 🎯 The challenge: Build a PC with a $500 budget ($300 for the PC, $200 for water cooling) with a twist – no off-the-shelf PC water cooling gear.
  • πŸ† Judging criteria include creativity, effectiveness, aesthetics, acoustics, and overall score, with points deducted for outside help, going over time, or exceeding budget.

Luke's Approach: The "Ghetto FR 3000"

  • πŸ’‘ Luke aimed for a functional build, focusing on creative water cooling solutions using unconventional parts like a water bottle reservoir and a mounted power bar for a cleaner setup.
  • ⚠️ His build faced significant challenges, including a leak into the power supply, raising doubts about its reliability and functionality.
  • πŸ’° Luke returned $40 worth of fittings to stay within budget, spending $280 on the PC and $198 on water cooling.

Linus's Approach: The "Uber Cooler Magic Machine 5000"

  • πŸš€ Linus focused on a copper coil cooling system (CCS), utilizing a car heater core as a radiator and custom-made CPU block from CNC-cut aluminum and copper.
  • πŸ› οΈ He faced difficulties bending copper tubing without kinking, eventually resorting to filling it with sugar and using zip ties for fittings.
  • πŸ“ˆ While his CPU temperatures reached 87Β°C under load, he emphasized the passive cooling aspect and the system's quiet operation, aiming for a high score in acoustics.

Component Sourcing and Fabrication

  • πŸš— Both builders scavenged parts from auto junkyards, pet stores, and hardware stores, looking for radiators, pumps, reservoirs, and materials for custom blocks.
  • βš™οΈ Linus utilized a neighbor's CNC mill for precise fabrication of aluminum and copper blocks, while Luke relied on JB Weld and silicone for sealing.
  • πŸ’§ Sourcing submersible pumps and finding suitable, affordable radiators proved to be significant hurdles for both participants.

Challenges and Setbacks

  • 🚧 Linus encountered issues with bending copper tubing, kinking, and finding appropriate fittings, leading to a mixed-metal loop and the need for corrosion inhibitors.
  • πŸ“‰ Luke struggled with leaks, pump head pressure, and the curing time of sealants, requiring multiple attempts and repairs.
  • ⏳ Both builders went over the allotted time, with Linus admitting to being 18-20 hours over.

Judging and Outcome

  • πŸ“Š The judges evaluated creativity, effectiveness, aesthetics, acoustics, and overall impression, factoring in budget and time constraints.
  • πŸ† Linus's "Uber Cooler Magic Machine 5000" was declared the winner of Scrapyard Wars 2, scoring 138 out of a possible 200 points.
  • πŸ’” Luke's "Ghetto FR 3000" received a score of 100 points, with judges noting its significant leaks and functional issues.
Knowledge graph40 entities Β· 33 connections

How they connect

An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.

Hover Β· drag to explore
40 entities
Chapters20 moments

Key Moments

Transcript288 segments

Full Transcript

Topics15 themes

What’s Discussed

Scrapyard WarsPC BuildingWater CoolingBudget PCCustom PCDIYComputer HardwareJunkyard PartsCNC MachiningCopper TubingRadiatorCPU BlockPumpReservoirLTT
Smart Objects40 Β· 33 links
MediasΒ· 2
CompaniesΒ· 6
PeopleΒ· 3
ProductsΒ· 12
ConceptsΒ· 15
EventΒ· 1
LocationΒ· 1