Logging, Brush Hauling, and Road Undercutting with Excavators and Dozers
letsdig18March 30, 202527 min101,231 views
10 connectionsΒ·15 entities in this videoβMorning Operations: Saw, Excavator, and Brush Hauling
- πͺ΅ The day begins with preparing equipment, including a new chain on the saw and warming up the 220 excavator.
- π² Several trees are cut in the back, with assistance from Tyler, to clear the area and prepare for hauling logs and pulpwood.
- π The team focuses on loading brush into a truck, with two people making the process quicker and allowing for cleanup of smaller debris.
- πͺ΅ Loading smaller hardwood trees presents a challenge as they don't break easily, requiring careful placement and securing with brush.
Log Loading and Pulpwood Management
- πͺ΅ Logs are loaded to open up space for hauling pulpwood up from cleared paths.
- πͺ΅ The amount of hardwood logs is less than initially expected, but they are still hauled out.
- π² A significant load of hardwood pulpwood is identified, potentially exceeding a tractor-trailer capacity.
- πͺ΅ The decision is made to haul both hardwood and pine pulpwood, with pine being a longer round trip.
Equipment Use and Challenges
- πͺ΅ The log truck driver's preference for hauling hardwood or pine is considered.
- πͺ΅ Hauling this material is costly, leading to a tendency to burn it, but cutting was necessary to create working room.
- π Tyler gains experience loading with a grafter on a 350, finding it less precise for picking up logs compared to the 220 excavator's grapple.
- πͺ΅ Logs are stacked as evenly as possible to facilitate easier loading onto trucks.
Road Work and Undercutting
- π² Pine pulpwood is brought up and stacked, followed by hardwood pulpwood.
- π The dozer is used to blade over the road, consolidating debris for hauling.
- π§οΈ The goal is to dry out the road surface before expected rain, preventing large ruts filled with water.
- β°οΈ A significant amount of sweeter material is cut out and loaded, working uphill.
- β οΈ The area requires undercutting about 3 feet of dirt, which was not initially planned.
- π A smaller dozer might be easier for contouring the road crown compared to the D7, which pushes a lot of dirt but is less precise for shaping.
- π Dirt, mud, topsoil, roots, and junk are loaded and stockpiled in the back, along with the brush.
- πͺ΅ The last load of logs for the day is prepared.
- β All brush is loaded out, and the road is cleaned up, marking the end of the day's work.
Knowledge graph15 entities Β· 10 connections
How they connect
An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.
Hover Β· drag to explore
15 entities
Chapters4 moments
Key Moments
Transcript49 segments
Full Transcript
Topics10 themes
Whatβs Discussed
ExcavatorBrush HaulingLoggingPulpwoodRoad MaintenanceDozersHeavy EquipmentMaterial HandlingSite CleanupUndercutting
Smart Objects15 Β· 10 links
PersonΒ· 1
ProductsΒ· 9
ConceptsΒ· 5