How to Quickly Assemble the EAGERLED EA640F2 LED Video Wall
LED Screen Factory-EagerLEDJune 21, 20253 min394 views
7 connections·11 entities in this video→EA640F2 LED Video Wall Assembly Steps
- 🛠️ Insert the Novaar receiving card into the PCB board and secure it with screws.
- ⚡ Connect the ring terminal wires to the PCB board, aligning them with the holes and fixing with screws.
- 🔌 Connect the six signal wires and six power wires into the PCB board in sequence.
- 💡 Connect the ground wire to the power interface.
- 🔗 Attach the other end of the ring terminal wire on the PCB board to the power interface.
- 🔩 Secure the power supply to the cabinet using the connecting iron sheet and connect the ground wire.
- 📐 Fix the PCB board with screws after proper alignment.
- 🔒 Ensure the PCB board is fixed with screws on both sides.
- 🔗 Align the cabinet and tighten the four fixings.
- 🔌 Connect the module signal wire and power wire.
Final Testing and Quality Assurance
- ✅ After the LED cabinet is assembled, the entire LED screen is put together.
- ⏳ An aging test is conducted for at least 72 hours to ensure reliability and performance.
Knowledge graph11 entities · 7 connections
How they connect
An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.
Hover · drag to explore
11 entities
Chapters1 moments
Key Moments
Transcript9 segments
Full Transcript
Topics12 themes
What’s Discussed
LED Video Wall AssemblyEA640F2 LED DisplayNovaar Receiving CardPCB Board InstallationSignal Wire ConnectionPower Wire ConnectionGround Wire ConnectionPower Supply InstallationLED Cabinet AssemblyAging TestFront Service DesignIndoor LED Sign
Smart Objects11 · 7 links
Products· 11