Extending a Pond Dam: Excavator Work and Core Trench Construction
letsdig18July 20, 202543 min120,879 views
15 connectionsΒ·18 entities in this videoβPond Dam Grade and Initial Excavation
- π― Laser setup is used to check and confirm the top of the pond dam is at the correct grade, with minor adjustments needed.
- π‘ The plan is to cut down the excess material and extend the dam section towards a nearby ditch.
- β οΈ A green film appearing overnight on the water is noted but its cause is unknown.
Addressing Wet Areas and Coffer Dam Construction
- π§ An attempt is made to fill a lower, wet section of the dam to build a coffer dam and enable excavation.
- π§ The presence of significant water flow is observed, attributed to heavy rainfall (3.5 inches) the previous week.
- π οΈ Dry dirt is used to push wetter material out and begin digging, with the goal of creating a drier working area.
Core Trenching and Clay Placement
- ποΈ The strategy involves building a coffer dam, digging out the wet area, and then placing clay to create a core trench.
- π§± The aim is to establish a solid base and then dig a drainage ditch once the area is above water level.
- β οΈ Leaks in the temporary coffer dam are addressed by smearing mud and grass to seal them.
- π A compactor is brought in to help pack the clay in the core trench, with the goal of getting it 2-3 feet above water level.
Progress and Material Handling
- π Red clay is identified as good material for sealing the dam, while sandier yellow material is reserved for less critical areas.
- π Dirt is moved using trucks, with loads tracked to estimate yardage moved.
- π§ The process involves digging out mud, filling with clay, packing it, and then cutting a new trench to allow drainage.
- π A Kubota bulldozer is used for shaping and blending the back slope of the dam.
Finalizing the Dam Section
- β The dam is brought to grade, with the backside built up and the front side trimmed for a smooth slope suitable for farm equipment.
- π§ The importance of a well-maintained dam for farm maintenance is highlighted.
- π A total of 72 loads of dirt are moved on the final day, with progress made on grading and stockpiling material for the next day's work.
Knowledge graph18 entities Β· 15 connections
How they connect
An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.
Hover Β· drag to explore
18 entities
Chapters10 moments
Key Moments
Transcript112 segments
Full Transcript
Topics12 themes
Whatβs Discussed