Excavator and Dozer Work: Clearing Large Trees and Preparing for Snow

letsdig18February 5, 202642 min110,948 views
15 connections·25 entities in this video

Morning Preparations and Initial Clearing

  • ❄️ The excavator received a 15-20 minute warm-up due to very cold morning temperatures.
  • 🔥 The immediate goal was to condense the fire pile by stacking more brush and larger trees.
  • 🚜 Robert arrived with a dozer, loaded with stumpers and attachments, to assist with clearing bigger trees.

Managing Debris and Burning Piles

  • 🪵 Large logs were moved to the top of the pile to aid in burning.
  • 💨 The dry conditions made burning a concern, with a risk of setting the entire farm ablaze.
  • 🧹 Using a rake helps to sweep debris into the pile, minimizing dirt mixed in, which burns down as the pile consumes itself.
  • 🌲 A large stump was left in place, with brush piled around it, as it was too large to remain on top of the pile.

Equipment and Weather Challenges

  • 🌨️ Anticipation of significant snowfall impacted the day's work, with plans to finish raking before it arrived.
  • 🧰 The rake was used for sorting, though the bucket was preferred for its grabbing ability, despite worn teeth.
  • 💰 New bucket teeth cost approximately $12,500, so the current worn set was being used to its full potential.
  • 🥶 Robert was working with chainsaws, taking breaks to warm up in the dozer.

Introducing the Volvo 350

  • 🚀 The Volvo 350 excavator was brought in to handle larger trees and speed up the clearing process.
  • 🪵 Its massive bucket size was highlighted in comparison to a pickup truck and a chainsaw.
  • 🛠️ The stumper attachment was utilized on the 350 to tackle large stumps.

Taking Down Large Trees

  • 🌳 The 350 was used to take down large sweet gum trees near property lines, reducing debris in fields used for crops.
  • ⚡ A significant challenge involved maneuvering a large tree near a power line and guide wire, requiring careful handling and camera monitoring.
  • 💪 The 350 proved capable of handling very large trees, described as comparable to picking up a smaller dozer.
  • 📸 The impressive size of one tree warranted taking a picture.

End of Day Progress and Future Plans

  • ✅ Robert finished his work, leaving the operator to continue clearing.
  • 🪵 A large stack of hardwood and miscellaneous wood was prepared, with plans to haul some off rather than burn it.
  • 🌨️ With 5-8 inches of snow forecasted, the team was satisfied with the day's progress, having cleared significant brush, felled trees, and stacked debris.
Knowledge graph25 entities · 15 connections

How they connect

An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.

Hover · drag to explore
25 entities
Chapters8 moments

Key Moments

Transcript108 segments

Full Transcript

Topics13 themes

What’s Discussed

ExcavatorDozerLand ClearingTree RemovalFire PileVolvo 350Stumper AttachmentRake AttachmentHeavy EquipmentWinter WeatherDebris ManagementLoggingFarm Work
Smart Objects25 · 15 links
Products· 11
People· 2
Concepts· 9
Event· 1
Location· 1
Media· 1