Chevy 632 SS Build: Chassis Strengthening and Drivetrain Installation

POWERNATIONMay 10, 202521 min42,027 views
23 connections·40 entities in this video→

Chassis Strengthening with Boxing Plates

  • πŸš€ The 632 SS project chassis is being strengthened to handle over 800 horsepower by welding in boxing plates to the C-channel frame.
  • πŸ’‘ This modification aims to prevent frame twisting when launching the vehicle, addressing the open middle section of the GM frame design.
  • πŸ› οΈ Before welding, the frame interior is cleaned and prepped with POR15 cleaner degreaser and metal prep for rust prevention and coating adhesion.
  • ✨ A POR15 rust preventative coating is applied to the inside of the frame rails to protect against rust, especially since interior access will be lost after boxing.

Rear Fuel Tank Relocation

  • 🎯 The fuel tank is relocated to the rear of the truck for better weight balance, utilizing an 18-gallon rear mount fuel tank from Tanks Inc.
  • 🧩 A factory crossmember was removed to make space, and a new tubular crossmember was fabricated and installed to maintain structural rigidity.
  • βš™οΈ Rivets holding brackets were removed using a cut-off wheel and air chisel to clear the area for the new fuel tank mounting.

Drivetrain Installation: Engine and Transmission

  • 🐎 The Tremec Magnum 6-speed transmission from American Powertrain is being installed, featuring a twin-disc clutch setup capable of handling 1000 ft-lbs of torque.
  • πŸ”§ Key steps include installing the pilot bearing, scatter shield, flywheel with new bolts torqued to spec, and carefully aligning the clutch discs using an alignment tool.
  • 🎯 The clutch alignment tool is crucial for centering the clutch discs, ensuring the transmission's input shaft can slide in smoothly.
  • πŸ” The throwout bearing spacing is measured and adjusted using shims to achieve the correct air gap with the pressure plate fingers, targeting a specific window for optimal performance.

Rear End and Transmission Mount

  • πŸ”© A Quick Performance nodular case third member with a 1350 billet yoke, Detroit True Track, 35 spline axles, and a 3.25 gear set is installed to match the Big Block's torque.
  • πŸ“ The pinion angle is set on the rear end, and then the transmission's drive line angle is matched using an angle finder on the tail shaft.
  • πŸ› οΈ A custom DOM tube crossmember is fabricated and installed to support the transmission, as the boxing plates altered the original mounting location.
  • βœ… The new crossmember is designed for rigidity and proper alignment, with brackets bolted and welded into place after confirming squareness.
Knowledge graph40 entities Β· 23 connections

How they connect

An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.

Hover Β· drag to explore
40 entities
Chapters9 moments

Key Moments

Transcript73 segments

Full Transcript

Topics20 themes

What’s Discussed

Chassis StrengtheningBoxing Plates800+ Horsepower EngineRAT EngineC-Channel FrameRust PreventionPOR15Fuel Tank RelocationTanks Inc.Tremec Magnum 6-SpeedAmerican PowertrainTwin-Disc ClutchFlywheel InstallationThrowout BearingQuick PerformanceThird MemberPinion AngleTransmission CrossmemberDrivetrain InstallationMusic City Trucks
Smart Objects40 Β· 23 links
CompaniesΒ· 4
ProductsΒ· 27
ConceptsΒ· 9