Skip to main content

Bangor Plane Crash: ATC Audio Reveals Visibility, De-ice Plan, and Airport Closure

KHOU 11January 27, 20268 min87,430 views
10 connections·11 entities in this video

Pre-Crash Conditions and De-icing

  • ✈️ Pilots discussed a plan to taxi back for de-icing after an initial spray, aiming to try again.
  • ⚠️ Concerns were raised about visibility dropping significantly near the runway end, with one pilot calling the conditions "stupid."
  • ❄️ The tower provided a weather update: light snow, visibility at 3/4 mile, and Runway Visual Range (RVR) of 6,000+.

Visibility and RVR Discussions

  • 📏 Pilots inquired about visibility limits, with one stating a need for a takeoff alternate if visibility was less than a mile.
  • 📊 The current RVR was reported as touchdown at more than 6,000, midpoint at 5,000, and rollout at 5,500, with plans to increase runway light intensity.
  • 🤝 A pilot-to-pilot exchange confirmed that conditions near the runway end were poor, impacting their decision to fly.

Airport Closure and Crash Response

  • 🛑 The tower announced that all traffic was stopped and the airport was closed.
  • 💥 Radio traffic indicated an aircraft was upside down, confirming a crash.
  • 🚑 Early crash response involved discussions about an initial onboard count, with estimates of three crew and possibly five passengers.
  • 🚧 Airport command coordinated the movement of crash vehicles on the airfield, which was closed for the foreseeable future.

Post-Crash Assessment

  • 📝 The tower confirmed that airfield braking action assessment had been completed.
  • ❓ Airport command sought to confirm the total number of souls on board from the FBO.
Knowledge graph11 entities · 10 connections

How they connect

An interactive map of every person, idea, and reference from this conversation. Hover to trace connections, click to explore.

Hover · drag to explore
11 entities
Chapters1 moments

Key Moments

Transcript29 segments

Full Transcript

Topics10 themes

What’s Discussed

Air Traffic ControlPlane CrashBangor International AirportVisibilityRVRDe-icingTakeoff AlternateAirport ClosureCrash ResponseOnboard Count
Smart Objects11 · 10 links
Companies· 2
Concepts· 8
Location· 1